Why LOTO records fail

The Challenge

Isolation is hard to verify

Locks and tags are applied on paper or by word of mouth. No one can confirm afterwards which points were isolated or who released them.

Steps happen out of order

Work starts before verification, or equipment is released before everyone has cleared. The record does not show it.

How FacilityFlow fixes it

A fixed LOTO workflow

LOTO moves through Required, Applied, Verified and Released, with Failed and Blocked states. Each record lists isolation points, locks and tags.

Evidence and checklist

A safety checklist and evidence, including photos, are kept with the record. Evidence is searchable in the Evidence Library across LOTO, faults, work orders and visits.

Capabilities

What LOTO covers

Isolation, verification and release records.

  • Linked to PM and permits

    PM schedules can attach safety requirements and a linked MSRA, and LOTO sits within planned maintenance visits. Permits record isolation points too.

  • Mobile capture with proof

    Technicians record work on the mobile app, including offline. Photo capture time and GPS are recorded on maintenance-visit photos and cross-checked.

Faq

LOTO questions

FacilityFlow

Integrated facility management for operations, compliance and workforce teams.

Contact

© 2026 FacilityFlow by Techseria. All rights reserved.